TPP Udarnaya (Russia)

TPP Udarnaya (Russia)

There is a combined-cycle thermal power plant under construction in the Krymsky district of the Krasnodar Region.

SPS carries out the manufacture and supply of pipelines in the volume for the construction of a power plant with a capacity of 500 MW

The TPP is planned to be put into operation in 2024